I am trying out LGM and was wondering if anyone has experience with custom sequences and would like to give some input on the following sequence:
- Request to connect
- If connection request is accepted during 7 days we initiate a linkedin sequence with an outreach + 2 follow-ups
- If connection request is not accepted after 3 days we initiate an email sequence with initial outreach + 2 follow-ups
Scenario I need feedback on:
If the lead does not accept the LI invite during the first 3 days we initiate the email flow. But what if the lead accepts the LI invite 4 days after the request was made? In this case it will technically still be within the acceptance period in (2) above and would it mean it then triggers both flows?